[edit] Introduction
On 20 April 2021, the Government commissioned the British Standards Institution (BSI) to draft a Publicly Available Specification (PAS) code of practice for assessors when examining external walls and cladding. PAS's are fast-track standards, specifications, codes of practice or guidelines developed by sponsoring organisations to meet an immediate market need.
PAS 9980 PAS 9980:2021 Fire risk appraisal and assessment of external wall construction and cladding of existing blocks of flats - Code of practice, is part of the Government’s effort to reform the building sector in the wake of the Grenfell Tower fire. The consultation closed on 20 May 2021. The anticipated publication date of the standard is autumn 2021.
[edit] Purpose of the code of practice
The code of practice will help professionals provide consistent, risk-based and proportionate advice on whether remediation of the external walls is necessary. It addresses situations in which there is a single wall type or a mixture of different wall types. It also addresses buildings that are partially clad, as well as those that are fully clad, in combustible materials.
Wall buildups within the scope of this PAS include, but are not limited to:
- External walls incorporating rainscreen cladding, with or without insulation in any associated cavity.
- External thermal insulation composite systems (ETICS), particularly those comprising rendered insulation.
- Insulated core (“sandwich”) panels.
- Glazed façades with infill/spandrel panels.
- Substrates including concrete blockwork, brick, steel framing systems (SFSs), timber framing and structural insulated panels (SIPs).
- Curtain walling.
Once approved, the code will support building professionals who undertake a fire risk appraisal and assessment (FRAA) of the external wall construction of existing multistorey, multi occupied residential buildings.
The PAS covers multistorey blocks of flats, but also includes the following types of buildings if, from the perspective of general fire strategy and means of escape design, and specifically evacuation strategy, they are similar in nature to a purpose built block of flats:
- Student accommodation.
- Sheltered and other specialised housing.
- Buildings converted into flats.
[edit] Comments
Building Safety Minister Lord Greenhalgh said, “As part of the biggest improvements to building safety standards in 40 years, we are taking firm action to ensure homes and buildings are safer. I welcome the launch of this consultation on a new code of practice, commissioned by the Government, which will ensure greater clarity and consistency for those completing assessments of external walls and a clear steer on where remediation is, or is not, required.”
Scott Steedman, Director-General of Standards at BSI said, “We welcome all comments on the draft standard, especially from people living or working on or in these types of buildings, including residents and people from the construction, fire, housing and safety industries.”
Ref https://www.gov.uk/government/news/consultation-launched-on-new-code-of-practice-for-external-walls
[edit] Related articles on Designing Buildings
- British Standards Institution BSI.
- BS 8414 Fire performance of external cladding systems.
- PAS 9980:2022
- Building codes.
- Cladding for buildings.
- Code of practice.
- Publicly Available Specification PAS.
- Risk assessment under The Regulatory Reform (Fire Safety) Order 2005.
- The role of codes, standards and approvals in delivering fire safety.
[edit] External resources
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.